Research & engineering center. Natural and wastewater treatment.
Professional solutions for natural and waste water treatment.
Phone: (812) 394-78-70
Home Sitemap Mail
To customers
To dealers
To designers
Useful Software

Customers


«Volvo»
«Volkswagen»
«Audi»
«Swebus»

and others

Questions list of vehicle and equipment washing

Download the question list (.rar, .pdf, 145 Kb)

CUSTOMER*:
Postal address:
Position of the responsible person:
Name*:
Telephone*:
Fax:
E-mail*:
1. Purpose of purchasing the facility*:


2. Type of vehicles washed or to be washed*:

trucks:
open:
closed:
passenger cars:
buses:
for other purposes:


3. Number of vehicles washed or to be washed, pcs/day:

trucks:
open:
close:
passenger cars:
buses:
for other purposes:
4. Description of washing equipment
    (type, throughput, quantity, operation regime)*:
5. Type of detergents (shampoos) used:


6. Description of the washer water-supply system (according to the design or existing)*:

water supply source:
municipal water-supply system:
technical water pipeline:
subsurface water:
river water:
water delivered by vehicles:
other source:
availability of water-conditioning equipment and its description:
availability and volume of water accumulation and regulation tanks:


7. Description of water-discharge system of the washer (according to the design or existing)*:

wastewater removal system:
discharge to the municipal sewerage system:
discharge to the industrial sewerage system:
discharge to the rainwater disposal system:
discharge to a water body:
discharge to an accumulation tank:
removal by a cesspool truck:
other:
availability of equipment for wastewater treatment after the washer and its description:
availability of wastewater accumulation and regulation tanks, their volume and layout:
8. Wastewater quality indicators and requirements for purified water:


п/п
Indicator Unit of measurement Value of indicator
wastewater required
1 Temperature °С
2 Suspended substances mg/l
3 рН unit
4 Petroleum products mg/l
5 Surfactants mg/l
Note: All rated indicators are presented in the table.
9. Wastewater flow rate, m3*:
per day:
per hour:
10. Work regime*:
11. Number of work shifts*:
12. Requirements for water        recycling system of the washer*:
13. Place of the washer arrangement*:
14. Other input data and special requirements
      (to be specified at the Customer's option):


Note: The data marked * are necessary for sending the Questionnaire.

Equipment of new generation for treatment of natural and waste water
Reliable, expense-saving and simple in operation equipment
Modern effective technologies of water recycling
Design of new equipment for special requirements
About company Equipment Services Vacancies Contacts To dealers To designers
© Potential-2 Ltd, 2001-2007
www.potential-2.ru,
197227, Saint-Petersburg,
Serebristy bulvar 18, building 3
Phone: +7 (812) 394-78-70
Fax: +7 (812) 380-96-14